What's a whizzer screw? Genuine question.spirit of 1990 wrote:
The tops of the cladding need all the whizzer screws putting in.
Sponsored by - S Rodgers, J Goodwin, B Millburn, PC Lettings, NSC, S Leonard, Give ‘em Beans, NSC & Surrey Barrovian
Re: Ground maintenance area
- spirit of 1990
- BarrowAFC Veteran
- Posts: 9885
- Joined: Sat Feb 13, 2010 10:50 am
- Contact:
Re: Ground maintenance area
I don't know whether that's the proper name (think it is though) but they're what hold the cladding to the framework behind & have a socket type head instead of the usual sort of screw.barrowfan wrote:What's a whizzer screw? Genuine question.spirit of 1990 wrote:
The tops of the cladding need all the whizzer screws putting in.
You can see them first hand at six tonight when you start firing them in if you want
We didn't underestimate them, we just didn't think they were that good.
- Wintergreen
- BarrowAFC Veteran
- Posts: 7482
- Joined: Fri May 30, 2008 12:38 pm
- Location: The Blue Planet
- Contact:
Re: Ground maintenance area
Would that be a self-drilling fastener with a hexagonal head? Incidentally if the HSE cladding is proving somewhat fragile, would it be feasible to ‘double it up’ with another layer of sheeting fixed directly over the top of the existing one?
- Attachments
-
- WHIZZER THING
- fastener.jpg (2.64 KiB) Viewed 2540 times
We will foller the soccer, over land and sea...
-
Holkerbird
- BarrowAFC Veteran
- Posts: 6547
- Joined: Sun Sep 07, 2008 1:27 pm
- Contact:
Re: Ground maintenance area
Anyone going down tonight, could you please move the paving slabs somewhere safe from kids as we don't want any falling on them on Saturday. I moved about 12 wheelbarrow loads of chippings today but the slabs were too much for me.
There's also two boards from the steward's cabin for the skip if you could do that please.
The paint tins from the stewards cabin were put in the skip despite being told we haven't to put paint tins in there so they are now sitting back on their doorstep!!!!! Sinkfall supply and empty the skip for free and we don't want to alienate them over paint tins.
There's also two boards from the steward's cabin for the skip if you could do that please.
The paint tins from the stewards cabin were put in the skip despite being told we haven't to put paint tins in there so they are now sitting back on their doorstep!!!!! Sinkfall supply and empty the skip for free and we don't want to alienate them over paint tins.
Re: Ground maintenance area
Only me there tonight Elaine so no heavy work done
there were 50 signs up against the wall inside turnstile c so I took around 30 of them inside the workshop and stacked at the back.......
also 8 cladding sheets inside turnstile c and these need to go into the workshop also as preventing the turnstile operator getting in so thanks to who ever for getting them all round by the workshop....you will have to inform if these go in through the week or we,ll have to get a squad down to move them before the game Saturday.
Had half an hour trying to get turnstile c door sorted...pined the jambs but the door beyond repair...rotten at the bottom...need a joiner to fit new door and mortice lock asap....also took a template to make patches for the cladding holes on the crossbar gable end where the water is getting into the changing room
thanks to whoever painted the 4 half module boards....could they be done on both sides and edges to form protection from steamy changing room after consulting our joiners...also the 2 full boards on the tressels..2 coats both sides and edges please....managed to cut the module wood for these 4 halfs before I left.(pass message on Elaine to graham please)
Special thanks to assuming Exile as there was a lovely supply of coffee tea cups kettle etc and Ian Cerruthers popped in with a microwave and another kettle as we bed in for a long winter swilling tea and eating warm pies while others do the work!!!ha
there were 50 signs up against the wall inside turnstile c so I took around 30 of them inside the workshop and stacked at the back.......
also 8 cladding sheets inside turnstile c and these need to go into the workshop also as preventing the turnstile operator getting in so thanks to who ever for getting them all round by the workshop....you will have to inform if these go in through the week or we,ll have to get a squad down to move them before the game Saturday.
Had half an hour trying to get turnstile c door sorted...pined the jambs but the door beyond repair...rotten at the bottom...need a joiner to fit new door and mortice lock asap....also took a template to make patches for the cladding holes on the crossbar gable end where the water is getting into the changing room
thanks to whoever painted the 4 half module boards....could they be done on both sides and edges to form protection from steamy changing room after consulting our joiners...also the 2 full boards on the tressels..2 coats both sides and edges please....managed to cut the module wood for these 4 halfs before I left.(pass message on Elaine to graham please)
Special thanks to assuming Exile as there was a lovely supply of coffee tea cups kettle etc and Ian Cerruthers popped in with a microwave and another kettle as we bed in for a long winter swilling tea and eating warm pies while others do the work!!!ha
- spirit of 1990
- BarrowAFC Veteran
- Posts: 9885
- Joined: Sat Feb 13, 2010 10:50 am
- Contact:
Re: Ground maintenance area
That's a pity that Tommy, I know your idea months ago was to give people another option to Sunday mornings but......mrsenario wrote:Only me there tonight Elaine so no heavy work done
mrsenario wrote:also 8 cladding sheets inside turnstile c and these need to go into the workshop also as preventing the turnstile operator getting in so thanks to who ever for getting them all round by the workshop
Exile earlier today.
Graham, also earlier today.mrsenario wrote:thanks to whoever painted the 4 half module boards
We didn't underestimate them, we just didn't think they were that good.
Re: Ground maintenance area
ok you win.....and there was no soccer on the telly......at least my Mrs popped in on her way home from a bike ridespirit of 1990 wrote:That's a pity that Tommy, I know your idea months ago was to give people another option to Sunday mornings but......mrsenario wrote:Only me there tonight Elaine so no heavy work done
mrsenario wrote:also 8 cladding sheets inside turnstile c and these need to go into the workshop also as preventing the turnstile operator getting in so thanks to who ever for getting them all round by the workshop
Exile earlier today.
Graham, also earlier today.mrsenario wrote:thanks to whoever painted the 4 half module boards
-
Holkerbird
- BarrowAFC Veteran
- Posts: 6547
- Joined: Sun Sep 07, 2008 1:27 pm
- Contact:
Re: Ground maintenance area
I will help Exile to shift the boards today if he is there, otherwise I will do them on my own. He must have walked some miles yesterday trailing those down to the workshop as it was getting hotter and hotter.
Tommy started the plastering in the director's rooms yesterday and hopefully will get it all finished before Friday so I can get it cleaned ready for Saturday.
I didn't know there is tea and coffee in the workshop.
We need a little fridge/cooler for the milk!!!!!
Today I have to move the sand, clean the outside toilets and clean the clubhouse------long shift. Oh and the boards, anyone got a tent?
Tommy started the plastering in the director's rooms yesterday and hopefully will get it all finished before Friday so I can get it cleaned ready for Saturday.
I didn't know there is tea and coffee in the workshop.
We need a little fridge/cooler for the milk!!!!!
Today I have to move the sand, clean the outside toilets and clean the clubhouse------long shift. Oh and the boards, anyone got a tent?
-
Puffing Ron
- Member
- Posts: 134
- Joined: Sun Aug 18, 2013 7:24 am
- Contact:
Re: Ground maintenance area
Elaine,
Tommy ( Barrowabc) and I have agreed to do a shift tomorrow (Thursday) as this works better for him.We can take a break from plastering to shift the paving stones and cladding then. Don't try on your own - I had a try yesterday and it was too much for me to tackle - two man job, at least , and much quicker and easier that way.
Pitch needs vacuuming though - seemed to be quite a few seagull feathers about.
Tommy ( Barrowabc) and I have agreed to do a shift tomorrow (Thursday) as this works better for him.We can take a break from plastering to shift the paving stones and cladding then. Don't try on your own - I had a try yesterday and it was too much for me to tackle - two man job, at least , and much quicker and easier that way.
Pitch needs vacuuming though - seemed to be quite a few seagull feathers about.
-
Holkerbird
- BarrowAFC Veteran
- Posts: 6547
- Joined: Sun Sep 07, 2008 1:27 pm
- Contact:
Re: Ground maintenance area
I was picking them up by hand yesterday and Exile's wife (who is French) thinks that is eccentric. Nothing wrong with being fastidious.Puffing Ron wrote:Elaine,
Pitch needs vacuuming though - seemed to be quite a few seagull feathers about.
-
Holkerbird
- BarrowAFC Veteran
- Posts: 6547
- Joined: Sun Sep 07, 2008 1:27 pm
- Contact:
Re: Ground maintenance area
Numbers have dropped off massively so we won't need many pies when the cold weather comes.mrsenario wrote:Only me there tonight Elaine so no heavy work done
Special thanks to assuming Exile as there was a lovely supply of coffee tea cups kettle etc and Ian Cerruthers popped in with a microwave and another kettle as we bed in for a long winter swilling tea and eating warm pies while others do the work!!!ha
- spirit of 1990
- BarrowAFC Veteran
- Posts: 9885
- Joined: Sat Feb 13, 2010 10:50 am
- Contact:
Re: Ground maintenance area
Although numbers have been dropping off lately (even amongst previous regulars) We're hoping this isn't a trend for the future months.
We've still plenty to be getting on with to get the ground up to where we all would like it to be, starting this Sunday morning again.
If you can help out with any of the following it'd be a great help to us if you can turn up for a few hours from 9:00am
Bad weather job's -
1/ Painting the first aid room - This has been dragging on for two months now & it's a bit shitty when the room has been done out to the standard it currently is but we can't actually finish it off with a few coats of paint (any weather job)
2/ Moving all the dance boards that are stored in the GMA to a more practical corner in there.
3/ Painting the backboards for the home changing room modules.
4/ Continuing the general tidy up of the workshop.
Fine weather job's -
1/ Whizzer screws being fastened into the top of the cladding, it's all marked up they just need firing in (only if it's fine)
2/ Moviing fencing to the GMA, removing empty paint tins, general tidy up of the ground.
3/ Continuing work in the turnstiles.
4/ If anyone is any good at replacing doors, turnstile "C" where we gain access is shot at, can't be fixed so we need a new one either making or we'll buy one but it'll need fitting.
5/ Help with removing scrap.
I really could do with knowing who (if anyone!!!) is available to help out on Sunday morning because it's just getting to the point where I can't be bothered dragging my arse out of bed if there's only going to be a couple there. That's not having a go at anyone but it's just pointless two or three people doing all this work when we have 800-1,000 people using the ground every other week.
I know mrssenorita is tied up for another three weeks on Sundays so that's going to make it even harder to progress anything at all.
PM's, reply on here or if you have my mobile number a text will do.
We've still plenty to be getting on with to get the ground up to where we all would like it to be, starting this Sunday morning again.
If you can help out with any of the following it'd be a great help to us if you can turn up for a few hours from 9:00am
Bad weather job's -
1/ Painting the first aid room - This has been dragging on for two months now & it's a bit shitty when the room has been done out to the standard it currently is but we can't actually finish it off with a few coats of paint (any weather job)
2/ Moving all the dance boards that are stored in the GMA to a more practical corner in there.
3/ Painting the backboards for the home changing room modules.
4/ Continuing the general tidy up of the workshop.
Fine weather job's -
1/ Whizzer screws being fastened into the top of the cladding, it's all marked up they just need firing in (only if it's fine)
2/ Moviing fencing to the GMA, removing empty paint tins, general tidy up of the ground.
3/ Continuing work in the turnstiles.
4/ If anyone is any good at replacing doors, turnstile "C" where we gain access is shot at, can't be fixed so we need a new one either making or we'll buy one but it'll need fitting.
5/ Help with removing scrap.
I really could do with knowing who (if anyone!!!) is available to help out on Sunday morning because it's just getting to the point where I can't be bothered dragging my arse out of bed if there's only going to be a couple there. That's not having a go at anyone but it's just pointless two or three people doing all this work when we have 800-1,000 people using the ground every other week.
I know mrssenorita is tied up for another three weeks on Sundays so that's going to make it even harder to progress anything at all.
PM's, reply on here or if you have my mobile number a text will do.
We didn't underestimate them, we just didn't think they were that good.
-
whitty1969
- Platinum Member
- Posts: 2937
- Joined: Sun Apr 21, 2013 9:47 pm
- Contact:
Re: Ground maintenance area
Ian, really buried with work and the wife's "To Do List" at the moment. Trying to get all my outside work completed before I lose the light and weather.
I don't have a bathroom at the moment, so need to get these finished before I come down.
Jobs have built up at home while I have been spending time at the ground.
I will be back, I know what I need to do.
I don't have a bathroom at the moment, so need to get these finished before I come down.
Jobs have built up at home while I have been spending time at the ground.
I will be back, I know what I need to do.
-
Barrowabc
- Gold Member
- Posts: 2203
- Joined: Tue Jan 08, 2013 11:14 am
- Location: Newbarns lodge
- Contact:
Re: Ground maintenance area
Ian I'm down all day tomo and will be there sat helping out sat
Also be there sun morn to help out as well
Would really hate to see this go tits up as no ones
Turning up would be shocking after all work been put in
To date.
Also be there sun morn to help out as well
Would really hate to see this go tits up as no ones
Turning up would be shocking after all work been put in
To date.
Love many, trust afew, but always paddle your own canoe ! My spelling is gash
Re: Ground maintenance area
i.ll be back on the sundays in 3 weeks due to work and christenings but still do the odd tue thur even sun night to get stuff made in quiet time and keep things ticking along also not forgetting meetings and oh yes..football
Who is online
Users browsing this forum: Bruce, Louis29, Semrush [Bot] and 25 guests